Northway Mushrooms, Ballygawley, Co. Tyrone

Northway Mushrooms, Ballygawley, Co. Tyrone

Client:  McAleer & Teague

Value:  £1.2 million

Contact:  Damian Kelly – 028 8289 8535

Contract Period:  April 2017 – August 2018

Northway Mushroom Plant is a new compost facility under construction in Ballygawley, Co Tyrone. McAleer & Teague are the main contractor on the project and McMackin Contracts were subcontracted to complete all siteworks which […]

Translink Laneway, Templepatrick, Co. Antrim

Translink Laneway, Templepatrick, Co. Antrim

Client:  McLaughlin Harvey

Value:  £75k

Contact:  Martin McKeown – 028 9021 0341

Contract Period:  September 2017 – November 2017

The works comprise of the construction of a 3.6m wide stone laneway within a 5m fenced boundary with associated access splay and boundary fence and hedge row. The construction of the laneway will allow Translink to […]

Moy Demense Housing Development, Moy, Co. Tyrone

Moy Demense Housing Development, Moy, Co. Tyrone

Client:  Tona Construction
Value:  £675k
Contact:  John Kelly – 077 1009 7794
Contract Period:  September 2014 – June 2016

This contract involved the bulk excavation and disposal of almost 30,000m3 of material off-site to licensed facility. The works involved the installation of all drainage on the scheme ranging from 1200mm concrete pipework to 150mm PVC pipes, all ducting and trenching for […]

Coca Cola

Works Undertaken – The scheme initially involved the identification and relocation of a substantial number of services around the site.  Following on from this there was a muck shift off the site with a quantity of approximately 15000m3 being moved to a licenced tip.  Following on from the muck shift a new culvert was installed […]

Casterbay Trunk Watermain

Works Undertaken – On the scheme Mc Mackin Contracts Ltd were responsible for the installation of 16km of watermain varying is size from 710mm to 180mm both in PE and Ductile Iron

McMackin Contracts carried out a substantial amount of site works to various sites on the scheme.  The works included muck-shifting to facilitate the construction […]

Juniper Hill Caravan Park Infrastructure Upgrade

Works involved new drainage system to full caravan site equating to 7000 linear metres, New Greywater drainage to touring sites (1000 linear metres), installation of new watermains (2000 linear metres).  New cabling to the entire caravan site (18000 linear metres), installation of new ductwork system (6500 linear metres) associated control panels/kiosks and new mini pillars […]

Beragh Flood Wall, Beragh, Co. Tyrone

Beragh Flood Wall

Client BSG Civil Engineering

 

Undertaken for the project:

Earthworks;
Fencing;
Concreting and reinstatement of private properties.

Davagh Play Facility

Davagh Forest Play Park was a Design and Build scheme completed for Cookstown Borough Council.  The site was located in an Environmentally Sensitive area with close liaison being required from the outset with the Ecology Manager from the Council in order to identify the main potential environmental sensitives of the site.  An Environmental Management Plan […]

Taghnevnan Allotments Project

Scheme was for Craigavon Council. It consisted of the development of an unused area of public ground to a new allotments scheme with the aim of community involvement in the running and operation of the facility. The scheme consisted of creation of the new facilities on the site including planting beds, polytunnels and recreational areas […]

Castlearchdale

This scheme involved the initial eradication of invasive species on the site and the disposal of these. Following on from this approximately 300m of existing forestry pathway was upgraded.  Rock Armour was positioned in a number of locations to prevent the erosion of pathways from watercourses.  New signage was erected around the site as well as the placement […]

Benone Pipeline

Installation of new 180mm twin wall waste water pumping line, including excavation and disposal of material. Works included reinstatement of ground and fencing. We also undertook the reseeding of excavated fields. Works on site included dewatering site clearance.
Project Details
Benone Pipeline

Client: BSG Civil Engineering

Installation of pumping sewer in sand conditions
dewatering

A4 Ballygawley- Dungannon Dual Carriageway

McMackin Contracts have undertaken various elements of work on the A4 Ballygawley – Dungannon Carriageway Scheme. Initial works involved considerable material excavation and disposal both on and offsite. This was carried out with a modern fleet of excavators, dump trucks and dozers.

We installed the culverts throughout the scheme. This work involved considerable excavation in all areas to facilitate the […]