Moy Demense Housing Development, Moy, Co. Tyrone

Moy Demense Housing Development

Moy, Co. Tyrone

Client:  Tvalley Construction
Value:  £675k
Contact:  John Kelly – 077 1009 7794
Contract Period:  September 2014 – June 2016

This contract involved the bulk excavation and disposal of almost 30,000m3 of material off-site to licensed facility. The works involved the installation of all drainage on the scheme ranging from 1200mm concrete pipework to 150mm PVC pipes, all ducting and trenching for […]

Castor Bay Trunk Watermain

Trunk Watermain

Castor Bay, Dungannon, Co. Tyrone

 

Client: BSG Civil Engineering

Value: £1.1M

Contact: Mr James Cassidy – 077 3661 3665

Works Undertaken – On the scheme McMackin Contracts were responsible for the installation of 20km of water-main varying in size from 710mm to 180mm both in PE and ductile iron.
McMackin Contracts also carried out a substantial amount of site […]

Nursing Home, Bray, Co. Wicklow

Nursing Home, Bray, Co. Wicklow

 

Client: McAleer & Teague

Works included site clearance, the bulk excavation on site, and ground preparation.

 

 

 

Juniper Hill Caravan Park Infrastructure Upgrade

Juniper Hill Caravan Park

C0. Derry

 

Client: Coleraine Borough Council

Value: Circa £1.5M

Contact: Mr Wayne Hall – 028 7034 7034

 

Works Undertaken – As main contractor on the Juniper Hill Caravan Park infrastructure upgrade scheme, McMackin Contracts were involved in considerable value engineering, which saved the client approximately £60k before works began. Prior to commencement on site all required health and safety […]

Magheraliskmisk Reservoir Works

Reservoir Works

Magheraliskmisk, Co. Antrim

 

Client: Lagan Construction Ltd

McMackin Contracts have been employed on various fronts on the scheme, for various elements of pipework installation, including ductile iron with diameters up to 900mm. Additional work undertaken by McMackin Contracts include drainage and ductwork around the site, as well as site finishes throughout various sites on the scheme.

Installation […]

Beragh Flood Wall, Beragh, Co. Tyrone

Beragh Flood Wall

Beragh, Co. Tyrone

 

Client: BSG Civil Engineering

 

Undertaken for the project:

Earthworks;
Fencing;
Concreting and reinstatement of private properties.

Play Park, Davagh Forest, Co. Tyrone

Play Park

Davagh Forest, Co. Tyrone

 

Client: Cookstown Borough Council

Value: £100k

Contract: Mr David Bell – 028 8676 2205

 

Works Undertaken – The scheme began with an initial design of the proposed play park, which was undertaken by McMackin Contracts. Following the acceptance of the design, all required ‘Health and Safety’ and ‘Environmental and Quality’ information was submitted to the […]

N17 – N18 Gort – Tuam Motorway

Work undertaken in this project included significant structural earthworks and extensive backfilling
Project Details
N17 – N18 Gort- Tuam Motorway

Client: Lagan construction Ltd

Structural Earthworks
Backfilling

Taghnevan Allotments Project

Taghnevan Allotments Project 

This project consisted of the development of an area of unused public ground into a new allotments scheme, with the aim of community involvement in running the completed facility. Planting beds, storage facilities, polytunnels, recreational areas, and a car park were constructed as part of the scheme. A number of different types of […]

Donaghmore Waste Water Treatment Works

Waste Water Treatment Works

Donaghmore, Co. Tyrone

 

Client: Lagan Construction Group Ltd

Value: £250k

Contact: Mr Richard Alcorn – 079 1907 4294

 

The scheme involves the construction of a new waste water treatment works in Donaghmore, Co. Tyrone. Initial works involved the identification and re-route of existing services on site as required. McMackin Contracts completed all civil works on the […]

Castle Archdale, Co. Fermanagh

Castle Archdale

This scheme began with the eradication and disposal of invasive species on the site. Following on from this approximately 300 metres of existing forestry pathway was upgraded. Rock Armour was positioned in a number of locations to prevent the erosion of pathways from watercourses.

New signage was erected around the site, as was new furniture, […]

Benone Pipeline

Benone Pipeline

Benone, Co. Derry

 

Client: BSG Civil Engineering

Installation of a new 180mm twin wall waste water pumping line, including excavation and disposal of material. Works also included: reinstatement of ground and fencing; reseeding of excavated fields; dewatering site clearance.