Project Description
Galway Bypass (TUAM)
McMackin completed the following works on a 22km section of the Tuam – Gort Bypass in Galway:
- Excavation & backfilling of all box culverts.
- Installation & sealing of all Precast Concrete box culverts.
- Installation of all road network drainage.
- Excavation & soiling of ponds.
- Installation of reinforced insitu headwalls
Project Details
CLIENT
Lagan Construction
CONTRACT PERIOD
May 2015 – September 2017
PROJECT VALUE
€1.6m
LOCATION
Tuam, Co Galway