Project Description

Castor Bay to Dungannon Strategic Watermain – 2011/2012

Works Undertaken – On the scheme McMackin Contracts were responsible for the installation of 20km of water-main varying in size from 710mm to 180mm both in PE and Ductile Iron.
McMackin Contracts also carried out a substantial amount of site works to various sites on the scheme. The works included substantial muck-shift to facilitate the construction of new infrastructure, new drainage, ducting and other apparatus throughout sites.
McMackin Contracts also carried out a substantial amount of surfacing on the scheme including tar, concrete and paving.
Various elements of concrete works were also undertaken by McMackin Contracts on the scheme including the sub-structures for new buildings as well as various elements of building works.
Quality Control was of vital importance on the scheme. McMackin Contracts developed a Quality Management Plan for the scheme for all the various elements of the scheme they were working on which included pipeline testing and reinstatement testing.

Project Details

CLIENT

BSG Civil Engineering.

CONTRACT PERIOD

2011-2012

PROJECT VALUE

£1.1M

LOCATION

Co Tyrone

Project Gallery