Project Description
250KW AD Plant, Eglinton
McMackin Contracts were contracted to complete all concrete, siteworks and drainage on a new 250KW AD Plant in Eglinton, Co. Derry.
The Project comprised of a 300m² Portal frame workshop and adjoining 2 storey office facility, a large silage pit with insitu walls and structural concrete floor, 3 Nr Digester Tanks and a large structural concrete yard area. The site was originally at various levels and required a cut/fill exercise with mixed ground conditions, mainly rock.
McMackin also installed all HDPE and Ductile Iron Pipework underground and completed tank bases for 3 Nr large Digester Tanks with the Precast Tank walls supplied by Macrete. Other works involved the following:
- 750m² structural Concrete yard.
- Installation of underground tanks for storm & “dirty”/unclean water.
- Excavation of drainage in rock areas.
- Backfilling submerged Digester tanks including tanking.
- Kerbing around concrete areas.
- Fencing to boundary of site.
Project Details
CLIENT
Evergreen Biogas Ltd
CONTRACT PERIOD
October 2016 – April 2017
PROJECT VALUE
£0.64 Million
CONTACT
Conor O’Driscoll