Project Description

Strabane Scouts Centre

Mc Mackins were the Main Contractor on the refurbishment of a Scouts Centre in Strabane, Co Tyrone.

The works description:

  •  Minor Improvements to external fabric.
  • Internal alterations and refurbishment of areas on the ground and first floors.
  • Extensive upgrade of mechanical and electrical service installations.
  • Audio Visual Installations
  • Replacement of existing passenger lift.

Additional Controls to be implemented throughout the project:

  • The building was occupied by the client during construction.
  • The existing main entrance had to remain in use at all times by the client.
  • The client required use of the main hall every Saturday and Sunday throughout construction work.
  • The client required use of the social area every evening throughout the construction works therefore toilet provision is in operation for the clients use.

Project Details

CLIENT

EANI

CONTRACT PERIOD

April 2018 – October 2018

PROJECT VALUE

£0.55 million