Project Description
Rathsherry (Broughshane)
The excavation associated with the 33kV NIE Grid connection, 11 kV connection and OHL diversion and wind farm cable ducting 9.5kms of trench, lay ducting, lay bed and surround, lay earth cable, backfill and reinstate, through some challenging ground conditions, Peat, rock and four river crossings.
Project Details
CLIENT
Adman Ltd
CONTRACT PERIOD
January – February 2017
PROJECT VALUE
£145K
LOCATION
Co Antrim