Project Description

Galway Bypass (TUAM)

McMackin completed the following works on a 22km section of the Tuam – Gort Bypass in Galway:

  • Excavation & backfilling of all box culverts.
  • Installation & sealing of all Precast Concrete box culverts.
  • Installation of all road network drainage.
  • Excavation & soiling of ponds.
  • Installation of reinforced insitu headwalls

Project Details

CLIENT

Lagan Construction

CONTRACT PERIOD

May 2015 – September 2017

PROJECT VALUE

€1.6m

LOCATION

Tuam, Co Galway